ArroPoint3

Generator Upgrade

A new control platform An old building power generator was in need of replacement. The specification called for two generators to replace the original, and some complex essential services vs. non-essential services controls for the building, together with communications to the BMS, ATSs, Power Monitors and other field equipment. ArroTek’s Scope Following award of the…

ArroPoint3

WTP Replacement

ArroPoint3 for Integration A site had a nearly 20 year old Water Treatment Plant they wanted to replace. They selected the new vendor, and wanted to continue to have water production while the plant was changed out so as not to impact their business. The new plant required communication with existing site infrastructure including existing…

ArroPoint3

Switchboards delivered for Qld Water Treatment Plants

Incorporating ArroPoint3 for secure remote HMI / PLC access and alarms via ArroAlerts A Water Treatment OEM selected ArroTek as their electrical partner to design , build, supply and remotely commission switchboards for their water treatment plants. These were required with short lead times. ArroTek’s Scope Following award of the WTP contracts, the OEM contacted…

ArroPoint3

New ArroPoint3 Installation

ArroPoint3 for ArroAlerts A golf course irrigation system comprised a mish-mash of automation controls. A PLC for the treatment plant, an irrigation control system for the solenoids and independent constant pressure pump sets for transfer and distribution of the water. The trouble was none of these three systems really coordinated their information, and none advised…

Pre-Production PLC Testing

Pre-Production PLC Testing

As a key partner for one of the world’s largest PLC manufacturers, ArroTek were sent a pre-production PLC for performance testing & comment. The new PLC family being released was put through its paces in many details – beyond just the technical merits of the actual processing capabilities, but also the labelling and packaging, connections…

HV Yard controls upgrade

HV Yard controls upgrade

22kV isn’t to be trifled with.  High Voltage yards and their strict control requirements mean that retrofitting an existing 30+year old site with a more modern platform requires considerations such as minimising production down time, while at the same time ensuring current regulatory compliance. ArroTek’s Scope ArroTek were subcontracted to develop a HMI for the…